No items found.
Monastery
Client
Marathon Construction
Year
Overview
Performed a large-scale site regrade and cut-to-fill operation across a challenging terrain. Scope included fire lane subgrade preparation, installation of flex base with geotextile reinforcement, and culvert/HDPE drainage infrastructure, ensuring long-term durability and site accessibility. General Contractor: Marathon Construction
The Challenge
